Soft Development:
This essentially involves all the engineering designs, studies permits, negotiation and contractual obligations prior to physical site activities

In 2015

  • License to Establish (LTE) from DPR
  • Approval to Construct (ATC) from DPR
  • Front End Engineering Design (FEED) from MUCME (UAE)
  • Obtaining of Certificate of Occupancy
  • Waterway Bathymetric studies
  • Completion of Geotechnical Surveys for concrete foundation works
  • International Finance Capital advisory and International Legal Team Engagement

In 2016

  • Two season Environmental and Social Impact assessment (ESIA) Certificate
  • Land Clearing and de-stumping and cart away of 19.92 Ha
  • Sand filling and land reclamation with 2.7 million cubic meters of sand
  • Land drainages, sedimentation

In 2017

  • Detailed Engineering Design (DED)
  • Product off-take Contract
  • Training abroad of young engineers for refinery operations
  • Feed stock contract
  • Contractual engagement for Operations and Maintenance

Infrastructural Development; This is all the site physical construction, civil and mechanical works to developing the project

In 2017

  • Construction of Concrete Perimeter Fencing
  • Water drainage system and land consolidation
  • Construction of 3.1Km internal road network
  • Gate and Security building
  • Offsite construction of 150 Apartment Units

In 2018

  • Concrete Piling of Crude and refined product storage tanks
  • Commencement of construction of storage tanks
  • Multi Station Gantry
  • Construction of Administrative Building
  • Terminal Operating Building
  • Helipad
  • Concrete and civil works for core for core Refinery Installation.